KUWS&DB water pipes laid in private layout
Eyebrows are raised over the action of two Karnataka Urban Water Supply and Drainage Board engineers who completed 800-metre length pipeline excavation work (for which there was no sanction) and laid
Eyebrows are raised over the action of two Karnataka Urban Water Supply and Drainage Board engineers who completed 800-metre length pipeline excavation work (for which there was no sanction) and laid