Krishna scheme to be ready by March, 2004
The Krishna water supply scheme would be ready by March 2004 instead of the original schedule of December, 2004. This was stated by Hyderabad Metropolitan Water Supply and Sewerage Board Managing
The Krishna water supply scheme would be ready by March 2004 instead of the original schedule of December, 2004. This was stated by Hyderabad Metropolitan Water Supply and Sewerage Board Managing