Marching from stability to development
If, for Capt Amarinder Singh 2002 was the "year of stabilisation', the next year 2003 has been designated as the "year of development'. Having inherited from the Akalis a "dismal state with empty
Related Content
- Action taken report by Uttarakhand Pollution Control Board on Mussoorie, 12/03/2024
- Joint committee report on the remedial measures taken by IRCON to contain the damage caused during the excavation of tunnel (T-77D), village Channar, Bankoot, district Rambar, Jammu & Kashmir, 17/04/2023
- From double shock to double recovery: implications and options for health financing in the time of COVID-19
- Report on measures to control illegal construction, waste management in Manali and Mcleodganj, Himachal Pradesh, 04/08/2020
- Impact of COVID-19 on the Global Financial System
- CPCB report on steps to contain air pollution in India, 06/03/2020