Profile of Arun III
LOCATION |
On the Arun river in Sankhuwasabha district, |
TOTAL POTENTIAL OF THE ARUN BASIN |
1,045 mw |
PRE-FEASIBlLITY STUDY |
March 1985 |
FEASIBILITY STUDY |
June 1987 |
DETAILED ENGINEERING STUDY |
December 1992 |
TARGET COMMISSIONING DATE |
April 1, 2001 |
TOTAL POWER GENERATION |
201 mw (Phase I), 201 mw (Phase II) |
TOTAL ESTIMATED COST |
US $1.2 billion. of which the 1st phase |
OTHER COMPONENTS |
117 km access road to the project |
Technical profile
FIRM FLOW OF THE ARUN RIVER |
75 cubic metre/second |
MAXIMUM GROSS HEAD |
304 metres |
CONCRETE GRAVITY DAM |
68 m high and 165 m long |
SPILLWAY |
Discharge capacity of 8,100 cusec |
HEADRACE SYSTEM |
2 head race tunnels, 11.4 km long and 5.6 m in finished |
DESANDING BASINS |
stage 1- 2 basins (110 m x 17 m x 28 m) Stage 11- 2 basins |
TURBINES |
3 x 67 mw for each phase |
POWER CAVERN |
168.24 m x 22 m x 35.25 m to house 6 generating units, |
TRANSFORMER CAVERN |
213.9 m x 10 m x 10 m |