downtoearth-subscribe

2.5-mw wind power plant to be synchronised today

  • 07/05/2004

The 2.5 mw wind farm demonstration unit on Narasimhakonda, 15 km from Nellore, is to be synchronised with the APTransco grid tomorrow. Set up with an aim to promote 'green power' generation, the