Nathpa Jhakri power project remains closed
Though the virulent Sutlej receded on Monday, the 1,500-MW Nathpa Jhakri power project remained closed for the third consecutive day. The water level has come down to 1,800 cumecs from 4,500 cumecs
Though the virulent Sutlej receded on Monday, the 1,500-MW Nathpa Jhakri power project remained closed for the third consecutive day. The water level has come down to 1,800 cumecs from 4,500 cumecs