PEDA to install 700 solar tubewells by March 31
The Punjab Energy Development Agency (PEDA) will install 700 solar tubewells by March 31 in the state, of which about 150 solar tubewells will be installed by the end of December. This was stated by
The Punjab Energy Development Agency (PEDA) will install 700 solar tubewells by March 31 in the state, of which about 150 solar tubewells will be installed by the end of December. This was stated by