Silt management in run-of-the river hydroelectric project - A case study
The present study evaluated the options of silt disposal from Beas Satluj Link (BSL) hydroelectric project in Himachal Pradesh in India. BSL project is basically a run of the river power project, envisages diversion of about 4700 MCM per annum of Beas river water into Satlej river falling through an elevation difference at about 320 m.