Conceptualization of project
Inception of Omkareshwar Project dates back to year 1955, when CWPC prepared a report on hydroelectric potential of entire Narmada river and the project has been mentioned as "Barwaha". It was also seconded in Khosla Committee report in 1965.
Related Content
- Bracing for climate impact: renewables as a climate change adaptation strategy
- Food-system interventions with climate change and nutrition co-benefits: a literature review
- Master plan for artificial recharge to groundwater in India 2020
- Waste to energy in the age of the circular economy: best practice handbook
- Assessment of fortification of Mid-Day Meal Programme in Dhenkanal, Odisha
- National Infrastructure Pipeline