Draft EIA/EMP report for expansion of coal based thermal power plant, Raigarh, Chhattisgarh by Korba West Power Company Limited
Korba West Power Company Limited has obtained Environmental clearance for 1 x 600 MW coal based TPP (Phase 1) in villages–Bade Bhandar, Chote Bhandar, Sarwani and Amali Bhauna, Tehsil – Pussore, Distt. – Raigarh, Chhattisgarh from Ministry of Environment and Forest, New Delhi in 2010 Vide F.No J - 13012/57/2008 - IA.II (T) letter dated 20th May, 2010. The project is under construction phase. Compliance of the conditions stipulated in EC letter are being submitted to the respective authorities on regular bases. This is the Draft EIA/EMP report for expansion of coal based thermal power plant, Raigarh, Chhattisgarh by Korba West Power Company Limited.