downtoearth-subscribe

Final Environmental Impact Assessment report for proposed (2×800 MW) Thermal Power Project at Vayalur Village, Ambathur Taluk, Thiruvallur District, Tamil Nadu

Final Environmental Impact Assessment Report (After Public Hearing as per MoEF Notification S.O.1533 dt. 14th Sep 2006) for Proposed (2×800 MW) Thermal Power Project at Vayalur Village, Ambathur Taluk, Thiruvallur District, Tamil Nadu. The proposed Ennore SEZ Thermal Power Project of 2X800 MW is coal based super critical technology to be located in Ash dyke of NCTPS. The proposed project employs two supercritical coal fired power generation units, each of which has 800 MW gross capacities, providing a total capacity of 1600 MW.