downtoearth-subscribe

Draft guidelines for selection of 1500 MW Grid Solar PV power projects under National Solar Mission, Phase-II Batch-II scheme of bundling with thermal power

Under Batch-II, Solar PV projects with a total capacity of 1500 MW capacity are proposed to be selected under the scheme of Bundling with Thermal power as in Phase-I, to be implemented through NVVN. The present Guidelines lay down the framework for implementation of this scheme. The scope of these guidelines is limited to providing the necessary policy and operational framework for development of projects under the above mentioned “Bundling Scheme”. These guidelines are independent and will have no bearing on the projects already selected under earlier schemes of NSM Phase-I & Phase-II.