downtoearth-subscribe

Amendment in the guidelines for implementation of a scheme for setting-up of over 5,000 MW Grid-Connected Solar PV Power Projects with Viability Gap Gunding (VGF) under Batch-IV of Phase II of the JNNSM

This has reference to the guidelines for implementation of a scheme for setting-up of over 5,000 MW Grid-Connected Solar PV Power Projects with Viability Gap Gunding (VGF) under Batch-IV of Phase II, issued vide the Ministry's O.M. of even number dated 14-03.2016.