Lump sum
Astandard burnt clay brick is 10 inches x 5 inches x 3 inches. Thus, one brick requires 150 cubic inch, or 0.0024 cubic metres, of top soil.
A manufacturing unit produces, on average, nearly 20 thousand bricks per day (mean of 10,000 and 30,000). If such a unit functions for six months in a year, it will produce 3.6 million bricks. For this, the unit will remove 3.6 million x 0.0024 cubic metres=8,640 cubic metre of topsoil every year (or, 0.5684 hectares of topsoil 5 feet (1.52 metres) deep). [Volume /depth=area, or 8,640/1.52=5,684 square metres (0.5684 hectare)]
Now, if there are 60,000 such units in India they would be making 60,000 x 3.6 million=200 billion bricks per year. This eats up nearly: 0.5684 hectare per unit x 60,000 units = 34,104 hectares of prime agricultural land.
Total agricultural land in India: 187 million hectares in 2000-2001*.
Related Content
- Rajasthan Electric Vehicle Policy, 2021
- Joint Committee report on sand mining in the districts of Gadag, Raichur and Kalburgi, Karnataka, 10/06/2021
- MPCB report on Malegaon pollution
- Order of the National Green Tribunal regarding melting of plastic for manufacture of plastic granules, Malegaon, Maharashtra, 15/10/2019
- How things work: OMEGA modeling case study based on the 2018 Toyota Camry
- Impacts of carbon pricing in reducing the carbon intensity of China's GDP