MoU with UP for release of water
-
26/12/2006
-
Statesman (New Delhi)
Attempts by DJB officials to get the requisite raw water for Sonia Vihar may have been drawing flak, however, now the utility is about to sign a MoU with U.P. for release of 300 cusecs of raw water required for the plant to function optimally.