Integrated EIA report for developing integrated faceilities within the existing Kandla port at Kandla

  • 31/08/2013

  • Mantec Consultants Pvt Ltd

An Integraged EIA report for developing integrated  faceilities within the existing Kandla port at Kandla was drawn up by Delhi-based Mantec Consultants Private Limited to collectively assess impact and suggest mitigation measures for nine sub-projects listed as part of this development plan. The "integrated" report includes development of:
 
  1. two barge jetties at Tuna and Khori creeks,
  2. oil jetty to handle liquid cargo at Old Kandla,
  3. upgradation of barge handling capacity at Bunder Basin,
  4. a railway line from NH 8A to Tuna Port,
  5. a multipurpose cargo terminal at Tekra off Tuna,
  6. construction of rail over-bridge at NH 8A near Nakti Bridge,
  7. mechanization of dry cargo handling facility at Kandla Port (Berth 7 & 8)
  8. ship repair/ building facilities, container terminal on a BOT basis and
  9. strengthening of two oil jetties.