Methodology (draft) for implementation of 750 MW new grid connected solar power projects Under JNNSM Phase-II, Batch-I
-
08/05/2013
-
Solar Energy Corporation of India
This documents is prepared based on draft guide lines issued by MNRE for selection of 750 MW New grid connected Solar Power projects Under JNNSM Phase-II, Batch-I and may undergo changes.