Quality control manual for grid connected rooftop solar PV systems and solar PV water pumping systems

  • 24/02/2023

  • Ministry of New and Renewable Energy (MNRE)

The Ministry of New and Renewable Energy vide notification dated 25.02.2023, To ensure the quality of installation and a structured mechanism for monitoring of the installations, has proposed to bring out quality control manuals for the following: Grid-connected Rooftop Solar PV System (Annexure A); and Standalone Solar PV Water Pumping System and Solarization of existing individual agricultural pumps (Annexure B).