Geology

Judgment of the National Green Tribunal regarding illegal mining of soapstone in village Papon, Bageshwar district, Uttarakhand, 22/04/2025

Judgment of the National Green Tribunal in the matter of Raghubir Singh Garia Vs State of Uttarakhand & Others dated 22/04/2025. The matter related to illegal mining of soap stone in village Papon, District Bageshwar, Uttarakhand. The complainant, a resident of the village said that illegal mining of soap stone …

Effectiveness of post-injection grouting in controlling leakage: A case study

In many occasions severe water leakage problems are faced in shotcrete lined or unlined water tunnels that not only reduce stability of the rock mass but also result in loss of valuable water in conveying tunnel systems. Such leakage causes safety risks and increases the potential for huge economic loss …

Luhri hydro electric project - Executive summary & salient features of detailed project report (DPR)

This Detailed Project Report has been prepared by Mott MacDonald to present the development of the proposed Luhri hydroelectric project on the Satluj River. The project lies downstream of the proposed Rampur hydroelectric project and upstream of the Koldam project which is currently under construction. http://sjvn.nic.in/projects/projects_luhri.asp  

Dhumal seeks Narendra Modis help for Geo-Informatics project

In a significant move to replicate Gujarat's model of space applications and geo-informatics in state's planning and development process, Chief Minister Prem Kumar Dhumal has sought help of his Gujarat counterpart Narendra Modi in setting up Aryabhatta Geo-Informatics and Space Applications Centre (AGiSAC) in Himachal Pradesh. The development comes close …

Hydropower scenario in Bhutan

Bhutan has an estimated hydropower potential of 30,000 MW and 12 TWh mean annual energy generation. So far 23,760 MW has been identified and assessed to be technically feasible. Only 1.488 MW, i.e., 5% of the feasible potential is harnessed so far. Royal Govt. of Bhutan (RGoB) in association of …

An overview of engineering properties of rock mass & seismic design - Mangdechhu hydroelectric project (720 MW), Bhutan

The 720MW Mangdechhu Project is located on Mangdechhu River in Trongsa Dzongkhag (District) of Central Bhutan. The dynamic analysis for the Mangdechhu Concrete Das is still to be carried out and the site specific seismic design parameters are under vetting by the National Committee for Seismic Design Parameters (NCSDP), India

Cracks in earths surface threaten Mizo town and village

Aizawl, Oct 7: Cracks have developed on the earth

Hydrogeological studies along the coastal area of Kanyakumari to Colachel after Tsunami, South Tamil Nadu

Hydrogeology of the Kanyakumari to Colachel aquifer was brought out by systematic hydrogeological, lithological and hydrological studies. Intensive field work was carried out to study the geomorphic and geologic variations within the study area.

Fissures widen further in Gool

JAMMU, Sept 27: With fissures on earth surface in remote Dharam village of Ramban district widening further, the administration has decided to acquire land in adjoining areas for the rehabilitation of the affected people instead of bringing them back to the village. Reports said that the cracks, which were around …

Prototype of gravitational wave detector on cards, to aid study

Pune Indian gravitational wave astronomy has taken one step closer to studying gravitational waves, which may be able to provide direct evidence for the existence of black holes as a prototype is being built of a gravitational wave detector. The project is being carried out by Tata Institute of Fundamental …

Optical clocks and relativity

Observers in relative motion or at different gravitational potentials measure disparate clock rates. These predictions of relativity have previously been observed with atomic clocks at high velocities and with large changes in elevation. We observed time dilation from relative speeds of less than 10 meters per second by comparing two …

Relativity comes down to Earth

As Einstein predicted, a slow drive or a step up a ladder is enough to warp time.

In fits ‘n’ starts

THE Indian tectonic plate smashed into Asia some 55 million years ago. A ripple of geological events followed, creating the Himalayan mountains and Tibetan plateau over 40 million years. Geologists could figure out how the highlands were formed, but disagree on the timeline of their formation. Evolutionary biologists from China …

Experts debate on water

Kohima, Sept. 8: The department of geology and mining today conducted a seminar on artificial recharge to groundwater through rainwater harvesting, in Dimapur. Regional director, Central Ground Water Board for Northeast region, G.C. Saha, said groundwater extraction was very high in different states in India, reducing density of water which …

Geotechnical aspects of the design of under water lake tap in Koyna hydro electric project- Stage IV

Under water lake tapping is a Norwegian technique developed in that country mainly to tap the inland lakes located high up in the mountains below their normal levels for electricity generation and drinking water supply. This technique has been used for the first time in India as well in Asian …

Sense the core

ROCKY layers of earth hold details about geological formations, their history and composition. The information is particularly valuable for mining companies to ascertain the quantity of minerals present in the earth's crust. To evaluate this, geologists carve out a cylindrical piece of subsurface material, called core sample, by a special …

Seismic vulnerability and risk in the Himalayan township of Mussoorie, Uttarakhand, India

Rapid visual screening technique has been resorted to for assessing seismic vulnerability and risk in the Himalayan township of Mussoorie that falls in Zone IV of the Earthquake Zoning Map of India.

Govt to compensate NTPC for cancellation of Uttarakhand project

In what could be the first for the country, the government today said NTPC would be duly compensated for the cancellation of its 600-mega watt (Mw) hydropower project at Loharinag Pala in Uttarakhand. The compensation could run into Rs 1,000 crore.Power Minister Sushil Kumar Shinde today said a Cabinet note …

That sinking feeling...

KOLKATA, 17 AUG: A casual approach to a serious civic issue, the rampant misuse of groundwater, might lead to massive subsidence in the city in the near future, engineers and geologists spoken to by The Statesman have said. Though the cave-in on Council House Street today was due to the …

Groundwater leakage worries BMC

Water is leaking out from the ground in Azad Maidan near CST and Marine Lines. The Brihanmumbai Municipal Corporation (BMC), which took note of the surface run-off recently, has now asked a consultant geologist to look into what might be causing the phenomenon.SK Gupta, a consultant geologist who has already …

  1. 1
  2. ...
  3. 5
  4. 6
  5. 7
  6. 8
  7. 9
  8. ...
  9. 30

IEP child categories loading...