Tawang (D)

Order of the National Green Tribunal regarding desilting of the Defence Colony drain in Delhi before the monsoon, 16/04/2025

Order of the National Green Tribunal in the matter of Nizamuddin West Association Vs Union of India & Others dated 16/04/2025. The matter related to desilting of 24 drains with special focus on two drains - Kushak drain and Sunheri Pul drain before the monsoon. The court was informed that …

Assessment of habitat use by Black-Necked Crane (Grus Nigricollis) and eflows of Nyamjang Chu Hyroelectric Project in Tawang District, Arunachal Pradesh

Buddhist monks in Arunachal Pradesh’s Tawang district have reason to cheer as their movement to save the winter habitat of the black-necked crane seems to have borne fruit. The Dehradun-based Wildlife Institute of India (WII)’s recent report, recommending the rejection of the proposed 780-MW Nyamjang Chhu hydropower project, is being …

Maintain environmental flow of 15-20 per cent in rivers: National Green Tribunal to states

The tribunal was hearing a plea filed by environment activist Pushp Saini seeking directions to the Centre and the states to maintain minimum environment flow in the rivers across the country to ensure their uninterrupted flow. The National Green Tribunal has directed all states to maintain a minimum environmental flow …

SMRF demands rollback of Tawang NHPC projects

Itanagar : The Save Mon Region Federation (SMRF) has asked the Central and state governments to fulfill its demand for immediate rollback of NHPC State I & II hydropower project from Tawang district. The SMRF also threatened to go to the United Nations Organisation (UNO) if the rollback is not …

Environment ministry panel holds back clearance for Tawang project

An environment ministry panel has decided to hold back clearance to 600 MW Tawang hydroelectric project in strategic Tawang Valley in Arunachal Pradesh keeping in mind the biodiversity rich forest area home to several critical endangered species and has asked for conducting an expert study to gauge the impact of …

Landslides in Arunachal district

Itanagar: Landslides triggered by torrential rainfall in the past couple of days washed away eight residential buildings in Tawang district, bordering China on Friday night. Though no casualty was reported, three persons sustained minor injuries. A car and a bike were damaged in the landslide that occurred at Barbara village …

MoEFCC drops its 45-day study period for assessing black-necked crane habitat in Tawang

GUWAHATI: The ministry of environment, forest and climate change (MoEFCC) has asked the Dehradun-based Wildlife Institute of India (WII) to conduct the study on black-necked crane habitat, located on the site for the proposed 780 MW Nyamjang Chhu hydropower project in Arunachal Pradesh's Tawang district, without any stipulated time frame. …

Judgement of the National Green Tribunal regarding grant of Environmental Clearance to the construction of Nyam Jang Chhu Hydroelectric Project, Tawang District, Arunachal Pradesh, 07/04/2016

Judgement of the National Green Tribunal in the matter of Save Mon Region Federation & Others Vs Ministry of Environment and Forests & Others dated 07/04/2016 regarding grant of Environmental Clearance (EC) dated 19.4.2012 to the construction of 780 Mega Watts (MW) Nyam Jang Chhu Hydroelectric Project (NJC-HEP) in Tawang …

Tawang groups protest against hydropower projects

Tawang district, which is situated at 10,000 feet above sea-level in Arunachal Pradesh, erupted in protest on Saturday against large hydropower projects in the district bordering the Tibetan region of China. Hundreds of Buddhist lamas and locals turned up at the Tawang parade ground, about 30km from the McMahon Line, …

Tawang hydel projects threaten rare crane

The graceful black-necked crane, which spends every winter in the Zemithang area of Arunachal Pradesh's Tawang district bordering China, finds itself caught between the country's development narrative and the religious beliefs of the Buddhist Monpa tribe. For the past few years, the Monpas of Tawang district have been expressing fear …

Assessment of snowmelt runoff in the eastern Himalayan region under climate change scenarios

In Eastern Himalayan region, snow melt is the major source of fresh water. Also, snow covered areas lying at low altitudes are expected to be most vulnerable to global warming. Thus, assessment of the snowmelt runoff under different climatic scenarios is important for efficient management and planning of water resources, …

Report on Tawang river basin study: cumulative impact assessment of proposed hydel power projects, determination of basin carrying capacity, and landscape level biodiversity management plan

While considering the accordance of forest clearance for 750 MW Tawang-I and 750 MW Tawang-II projects, the Forest Advisory Committee (FAC) of the Ministry of Environment and Forests, (MoEF and CC) asked the Government of Arunachal Pradesh to conduct a study on Tawang river basin with the following objectives: To …

Arunachal asks for approving Tawang-Vijayanagar Road

Arunachal Pradesh has urged the Centre to approve the proposed 2,000-km road from Tawang to Vijaynagar to provide connectivity to the border areas along the MacMohan line by declaring it as National Highway. State PWD Minister Gojen Gadi made the plea during a meeting with Union Minister of State for …

Arunachal’s one-shot nod for hydel, related projects pegged to MoEF stance

THE empowered group of ministers (EGoM) for hydel power projects in Arunachal Pradesh will find it tough to get the ministry of environment and forests (MoEF) on board for the proposed all-at-a-time clearance mechanism for supporting infrastructure projects. According to sources, at the upcoming EGoM meeting the power ministry will …

Online platform for green clearances

In a move to fast-track green nods, the government will digitise environment and forest clearances (EC and FC) at both the central and state levels. The new system will help companies file their applications online, track the status and get clearances within the stipulated time period. “While there will be …

Arunachal NGO against hydro-power projects

The ‘Save Mon Region Federation’ (SMRF) has opposed the 15 hydroelectric power projects that are under construction in Tawang district in Arunachal Pradesh for generating 3,500 MW power. Seeking the Central Government’s intervention in this regard, the SMRF submitted a memorandum to the Union Minister of Environment and Forest on …

Held up since 2011, Tawang hydel unit gets MoEF nod

The Tawang project will require diversion of 116 hectares forest land, including 19.6 hectares for underground use. A YEAR after the Forest Advisory Committee (FAC) gave its nod to the strategic Tawang II hydroelectric project in Arunachal Pradesh, the Ministry of Environment and Forests has cleared it. The 800 MW, …

Climate change affects tourists’ turn–out in Tawang

Climate change has a direct bearing on Tawang, the holy town in Arunachal Pradesh along the India–China border. Tawang draws highest number of tourists from within and outside India for its unspoiled natural beauty and famous 400–year–old Tawang monastery. The winter has been shifting from November–January to December–February, observed by …

Govt set to fast-track clearances for hydel projects in border areas

The government is set to give a big push to the development of hydro power plants in border areas by giving fast-track clearances to projects that are delayed for the last several years due to a complex approval mechanism. An empowered group of ministers (EGoM), headed by finance minister P …

NHPC seeks PM cell help to fast-track Rs 7,500-crore Arunachal plan

The National Hydroelectric Power Corporation has sought the assistance of the project monitoring group under the cabinet secretariat to fast-track the Rs 7,500-crore Tawang-II project in Arunachal Pradesh. In February, India hastened plans to construct 2,500 MW of hydro projects, including one in Tawang and another in Teestha in Sikkim …

NABARD to start horticulture in Tawang under TDF

National Bank for Agriculture and Rural Development (NABARD) has conducted a detailed consultation with the farming community of six villages in Tawang district, bordering China to start horticulture farms under Tribal Development Fund (TDF) programme. Delhi Based NGO InsPIRE Network for Enviornment (INE) and Yuva Arunachal have prepared a proposal …

  1. 1
  2. 2
  3. 3

IEP child categories loading...